We started siding and our porch was excavated and poured this week:o) The "A" on the top of the house was also completed so we could once and for all move the pump jacks from the front of the house. This was the week of the big clean out as well on the inside. All the remnant pieces and other garbage were cleaned out. Lastly, our front and right-side garage doors were installed. Moving right along........
The front door:o)
The finished "A"
The poured footers on the front of the porch
The poured footers of the side porch
The garage side doors installed and siding begun
Catch you all next week:o)
Rob and Brandy